Skip to content

Source catalog ​

Timeline · Official records

Every source used by this edition is listed below. Descriptive titles are editorial where the original title was not recovered. An archive URL records a capture; it does not turn the capture date into a patch date. Link availability can change. Body-unrecovered records are listed separately in the official-notice inventory.

Athena Dev 2.1.1 source archive ​

Athena Dev 2.1.1 source archive — emulator reference; emulator source code. athena2003 Access: recorded in existing research no new fetch. README says middle July 2003; archive listing says July 15. Not evidence of September 2002 Thai rules.

Scope: Japanese emulator, not official Thai server.

Japanese emulator, not official Thai server README says middle July 2003; archive listing says July 15. Not evidence of September 2002 Thai rules.

Cross-cutting research/comparison source; not assigned as proof of a particular Thai patch.

Athena historical archive listing ​

Athena historical archive listing — emulator reference; software archive catalog. athena_archive_index Access: recorded in existing research no new fetch.

Scope: Artifact location and claimed date; use archive README and hash too.

Artifact location and claimed date; use archive README and hash too

Cross-cutting research/comparison source; not assigned as proof of a particular Thai patch.

RagnaDB historical reconstruction dataset ​

RagnaDB historical reconstruction dataset — community research; historical reconstruction dataset. ragnadb Access: recorded in existing research no new fetch. No Thai timeline distribution or beta monster dataset in inspected bundle; metadata names source archives but originals not independently checked.

Scope: Cross-episode reconstruction, not Thai-specific.

Cross-episode reconstruction, not Thai-specific No Thai timeline distribution or beta monster dataset in inspected bundle; metadata names source archives but originals not independently checked.

Cross-cutting research/comparison source; not assigned as proof of a particular Thai patch.

Later mirror of early Thai operator announcements ​

Later mirror of early Thai operator announcements — operator material republication; attributed operator material republication. thai_mirror Access: later mirror html inspected; original provenance incomplete. Later mirror; provenance chain incomplete. Scheduled dates may not be deployment dates. Regional monster headings appear mixed; nearby no-reset and level-reduction claims need separation. Copied mirrors are not independent corroboration.

Scope: Candidate Thai patch dates and changes.

Candidate Thai patch dates and changes Later mirror; provenance chain incomplete. Scheduled dates may not be deployment dates. Regional monster headings appear mixed; nearby no-reset and level-reduction claims need separation. Copied mirrors are not independent corroboration.

Chapters: Thai closed beta, Thai open beta, Lutie seasonal addition, Clock Tower and Glast Heim, Pets and early monster/drop rebalance, Comodo, Turtle Island and WoE, Juno and alternate second jobs, Forging, potion-making and element-table update, Gonryun, Marriage and Super Novice, Louyang, Jawaii honeymoon addition, New Payon map replacement.

Later mirror of a Thai launch FAQ ​

Later mirror of a Thai launch FAQ — community research; community faq with attributed operator excerpt. thai_jnet_mirror Document date: 2012-09-09. Access: republication or compilation inspected; original provenance incomplete. No numerical EXP table; statement about harder leveling does not identify cause or rate.

Scope: Thai launch and CDs.

Mixed republication: an Asiasoft-attributed March 20, 2003 announcement followed by J-Net community FAQs. The harder-leveling observation comes from the community FAQ, not authenticated operator prose. The 2012 date belongs to the mirror publication.

Cross-cutting research/comparison source; not assigned as proof of a particular Thai patch.

Early Mage player guide ​

Early Mage player guide — community research; player guide. mage2002 Access: recorded in existing research no new fetch. Skill reports are not official Thai rules; use only as a candidate/lead.

Scope: Early international mage experience.

Early international mage experience Skill reports are not official Thai rules; use only as a candidate/lead.

Chapters: Beta 1: skills and Mage era.

July 2003 Priest player guide ​

July 2003 Priest player guide — community research; player guide. priest2003 Access: recorded in existing research no new fetch. Regional applicability unresolved; its forecast mentions INT while modern code uses MaxSP. Do not implement that forecast literally.

Scope: July 2003 guide describes flat SP recovery skill.

July 2003 guide describes flat SP recovery skill Regional applicability unresolved; its forecast mentions INT while modern code uses MaxSP. Do not implement that forecast literally.

Cross-cutting research/comparison source; not assigned as proof of a particular Thai patch.

Knight guide describing Juno recovery ​

Knight guide describing Juno recovery — community research; player guide. knight2004 Access: recorded in existing research no new fetch. Guide formula for HP omits minimum/base details present in current emulator code.

Scope: Author labels recovery formulas as Juno rules.

Author labels recovery formulas as Juno rules Guide formula for HP omits minimum/base details present in current emulator code.

Chapters: Juno and alternate second jobs.

Hunter guide describing recovery changes ​

Hunter guide describing recovery changes — community research; player guide. hunter2004 Access: recorded in existing research no new fetch. Qualitative and cross-region; no exact Thai effective date or old formula.

Scope: Author describes recovery changing from individual points to chunks.

Author describes recovery changing from individual points to chunks Qualitative and cross-region; no exact Thai effective date or old formula.

Chapters: Juno and alternate second jobs.

iRO Comodo update description ​

iRO Comodo update description — foreign operator original; patch description or patch note. iro_comodo Access: recorded in existing research no new fetch. Page date is not automatically implementation date or Thai date.

Scope: iRO skill and status changes.

iRO skill and status changes Page date is not automatically implementation date or Thai date.

Chapters: Comodo.

iRO Turtle Island update description ​

iRO Turtle Island update description — foreign operator original; patch description or patch note. iro_turtle Access: recorded in existing research no new fetch.

Scope: Monster skill rollout; not a Thai date.

Monster skill rollout; not a Thai date

Chapters: Turtle Island and WoE.

iRO Juno update description ​

iRO Juno update description — foreign operator original; patch description or patch note. iro_juno Access: recorded in existing research no new fetch.

Scope: Monster stats/rewards/placement, consumable weights and loot changes; not a Thai date.

Monster stats/rewards/placement, consumable weights and loot changes; not a Thai date

Chapters: Juno and alternate second jobs.

iRO Rebirth update description ​

iRO Rebirth update description — foreign operator original; patch description or patch note. iro_trans Access: recorded in existing research no new fetch.

Scope: Rebirth progression; not a Thai date.

Rebirth progression; not a Thai date

Cross-cutting research/comparison source; not assigned as proof of a particular Thai patch.

iRO official update index ​

iRO official update index — foreign operator original; news or update index. iro_updates Access: recorded in existing research no new fetch.

Scope: Later pre-Renewal systems; not a Thai date.

Later pre-Renewal systems; not a Thai date

Chapters: Noghalt and TaeKwon lineage, Hugel / 10.4.1 The Secret Warrior and Ninja, Rachel and socket enchanting, Nameless Island.

iRO Morroc update description ​

iRO Morroc update description — foreign operator original; patch description or patch note. iro_morroc Access: recorded in existing research no new fetch.

Scope: Episode 12 world changes; not a Thai date.

Episode 12 world changes; not a Thai date

Chapters: EP12.1: Destruction of Morroc and battlegrounds.

iRO Renewal news index ​

iRO Renewal news index — foreign operator original; news or update index. iro_renewal Access: recorded in existing research no new fetch.

Scope: Boundary example only: iRO Renewal rollout; not a Thai date.

Boundary example only: iRO Renewal rollout; not a Thai date

Cross-cutting research/comparison source; not assigned as proof of a particular Thai patch.

rAthena source at the audited commit ​

rAthena source at the audited commit — emulator reference; emulator source code. rathena Access: recorded in existing research no new fetch.

Scope: Pinned static implementation; not historical truth.

Pinned static implementation; not historical truth

Cross-cutting research/comparison source; not assigned as proof of a particular Thai patch.

Hercules source at the audited commit ​

Hercules source at the audited commit — emulator reference; emulator source code. hercules Access: recorded in existing research no new fetch.

Scope: Pinned static implementation; not historical truth.

Pinned static implementation; not historical truth

Cross-cutting research/comparison source; not assigned as proof of a particular Thai patch.

September 2001 English Alpha player guide ​

September 2001 English Alpha player guide — community research; player guide. alpha2001 Document date: 2001-09-22. Access: recorded in existing research no new fetch. Guide date is not Alpha launch date. Observational values and rare/common labels are not authenticated server records.

Scope: English Alpha as observed in guide updated 2001-09-22; not Thai.

English Alpha as observed in guide updated 2001-09-22; not Thai Guide date is not Alpha launch date. Observational values and rare/common labels are not authenticated server records.

Chapters: Alpha: English public test.

Community compilation of early international updates ​

Community compilation of early international updates — community research; community changelog compilation. global_beta_changelog Access: republication or compilation inspected; original provenance incomplete. Contains uncertain numbers and apparent year typos. Use quoted operator notices as attributed leads; do not silently assign international dates to Thailand.

Scope: International Alpha/Beta chronology.

International Alpha/Beta chronology Contains uncertain numbers and apparent year typos. Use quoted operator notices as attributed leads; do not silently assign international dates to Thailand.

Chapters: Beta 1: skills and Mage era.

Thai service launch schedule and reset-policy notice ​

Thai service launch schedule and reset-policy notice — thai operator original; operator announcement. thai_launch_original Document date: 2002-09-08. Archive capture: 2002-10-12. Access: archived or live html recovered and inspected. Scheduled dates; launch-day report separately confirms service. Archive capture is 2002-10-12. Saved HTML

Scope: Thai launch schedule and reset policy, document dated 2002-09-08.

Original URL · Archive capture

Thai launch schedule and reset policy, document dated 2002-09-08 Scheduled dates; launch-day report separately confirms service. Archive capture is 2002-10-12.

Chapters: Thai closed beta.

Thai launch-day operating report ​

Thai launch-day operating report — thai operator original; operator operating report. thai_launch_day Document date: 2002-09-16. Archive capture: 2004-04-05. Access: archived or live html recovered and inspected. Document survives in a 2004 capture. Does not provide numerical mechanics. Saved HTML

Scope: Thai service operating after five hours on 2002-09-16.

Original URL · Archive capture

Thai service operating after five hours on 2002-09-16 Document survives in a 2004 capture. Does not provide numerical mechanics.

Chapters: Thai closed beta.

Original Thai service news and announcement index ​

Original Thai service news and announcement index — thai operator original; news or update index. thai_early_index Archive capture: 2002-10-12. Access: index HTML recovered; only separately catalogued notice bodies are recovered. Actual capture is October 12, not requested September timestamp. Saved HTML

Scope: September 2002 launch and bug-report links.

Original URL · Archive capture

September 2002 launch and bug-report links Actual capture is October 12, not requested September timestamp.

Chapters: Thai closed beta.

Thai-language news index for the English Beta service ​

Thai-language news index for the English Beta service — english service operator original; news or update index. english_beta_thai_index Archive capture: 2002-07-23. Access: index HTML recovered; only separately catalogued notice bodies are recovered. Explicit English-server references. Predates Thai CBT; never equate Thai-language documentation with Thai deployment. Saved HTML

Scope: Thai-language support for English Beta in July 2002.

Original URL · Archive capture

Thai-language support for English Beta in July 2002 Explicit English-server references. Predates Thai CBT; never equate Thai-language documentation with Thai deployment. This Thai-language operator material concerns the English service, not the later Thai CBT.

Chapters: Beta 2: Thai-language support for English server.

English Beta 2 gameplay guide published in Thai ​

English Beta 2 gameplay guide published in Thai — english service operator original; operator guide. english_beta_identify Document date: 2002-07-17. Archive capture: 2002-11-12. Access: archived or live html recovered and inspected. Later capture; six second-job locations and identification item price, not full balance specification. Saved HTML

Scope: English Beta 2 guide dated July 17, 2002.

Original URL · Archive capture

English Beta 2 guide dated July 17, 2002 Later capture; six second-job locations and identification item price, not full balance specification. This Thai-language operator material concerns the English service, not the later Thai CBT.

Chapters: Beta 2: Thai-language support for English server.

English Beta bug-fix notice published in Thai ​

English Beta bug-fix notice published in Thai — english service operator original; patch description or patch note. english_beta_fixes Document date: 2002-07-23. Archive capture: 2002-11-06. Access: archived or live html recovered and inspected. Not a Thai server update despite Thai operator footer. Saved HTML

Scope: July 22 fixes reported July 23, 2002, English Beta.

Original URL · Archive capture

July 22 fixes reported July 23, 2002, English Beta Not a Thai server update despite Thai operator footer. This Thai-language operator material concerns the English service, not the later Thai CBT.

Chapters: Beta 2 fixes: milk and quest/NPC repairs.

Preserved Beta 2 operator-material republication ​

Preserved Beta 2 operator-material republication — operator material republication; attributed operator material republication. beehive_beta2 Access: archived or live html recovered and inspected. Undated notice on page marked since July 2, 2002. That footer is not a release date. English Beta applicability likely; Thai CBT applicability unresolved. Some descriptions or translations may be inaccurate. Saved HTML

Scope: Thai-language early Beta 2 mechanics notice attributed to Asiasoft/Gravity.

Thai-language early Beta 2 mechanics notice attributed to Asiasoft/Gravity Undated notice on page marked since July 2, 2002. That footer is not a release date. English Beta applicability likely; Thai CBT applicability unresolved. Some descriptions or translations may be inaccurate.

Chapters: Beta 2: Thai-language support for English server.

Thai Amatsu client and rollout notice republication ​

Thai Amatsu client and rollout notice republication — operator material republication; operator notice republication. thai_amatsu_notice Document date: 2004-05-06. Access: recorded in existing research no new fetch. Published May 6, 2004, body schedules April 19/26. Distinguish publication and rollout.

Scope: Thai Amatsu client and rollout schedule.

Thai Amatsu client and rollout schedule Published May 6, 2004, body schedules April 19/26. Distinguish publication and rollout.

Chapters: Amatsu.

Thai Umbala and Niflheim schedule republication ​

Thai Umbala and Niflheim schedule republication — operator material republication; operator notice republication. thai_umbala_notice Access: recorded in existing research no new fetch. Announcement is not proof of successful deployment.

Scope: Thai bundled Umbala/Niflheim schedule.

Thai bundled Umbala/Niflheim schedule Announcement is not proof of successful deployment.

Chapters: Umbala and Niflheim.

Thai Ayothaya operator interview and announcement ​

Thai Ayothaya operator interview and announcement — contemporary reporting; interview. thai_ayothaya_interview Access: recorded in existing research no new fetch. April 4/11, 2005 schedule. Article has conflicting development-start years; do not use those to date release.

Scope: Thai Ayothaya development and rollout.

Thai Ayothaya development and rollout April 4/11, 2005 schedule. Article has conflicting development-start years; do not use those to date release.

Chapters: Ayothaya.

Thai High-Class rollout notice republication ​

Thai High-Class rollout notice republication — operator material republication; operator notice republication. thai_highclass_notice Access: recorded in existing research no new fetch. July 4/18, 2005 schedule; not evidence every later trans skill was included.

Scope: Thai High-Class rollout and included systems.

Thai High-Class rollout and included systems July 4/18, 2005 schedule; not evidence every later trans skill was included.

Chapters: Rebirth and transcendent jobs.

Thai High-Class and temporary rate-event report ​

Thai High-Class and temporary rate-event report — contemporary reporting; news or feature report. thai_highclass_rates Access: recorded in existing research no new fetch. Sakray 6x and temporary double EXP must be scoped by server and event; not beta base rates.

Scope: Thai High-Class and rate events.

Thai High-Class and rate events Sakray 6x and temporary double EXP must be scoped by server and event; not beta base rates.

Chapters: Rebirth and transcendent jobs.

Thai Lighthalzen rollout announcement report ​

Thai Lighthalzen rollout announcement report — contemporary reporting; news or feature report. thai_lighthalzen_notice Access: recorded in existing research no new fetch. Sakray February 7 and main February 21, 2006 are announced dates.

Scope: Thai Episode 10.2 schedule and contents.

Thai Episode 10.2 schedule and contents Sakray February 7 and main February 21, 2006 are announced dates.

Chapters: Lighthalzen and Homunculus.

Report distinguishing Thai and Korean trans skills ​

Report distinguishing Thai and Korean trans skills — contemporary reporting; news or feature report. thai_trans_skill_split Access: recorded in existing research no new fetch. Mostly Korean June 28, 2005 update. Only explicit Thai comparisons apply regionally.

Scope: Thai initial High-Class excludes newer Korean trans skills.

Thai initial High-Class excludes newer Korean trans skills Mostly Korean June 28, 2005 update. Only explicit Thai comparisons apply regionally.

Chapters: Rebirth and transcendent jobs.

Thai Noghalt promotional interview ​

Thai Noghalt promotional interview — contemporary reporting; interview. thai_noghalt_interview Document date: 2006-09-07. Access: recorded in existing research no new fetch. Published September 7 but body speaks prospectively of August; retain date inconsistency.

Scope: Thai Episode 10.3 scheduled August 8, 2006.

Thai Episode 10.3 scheduled August 8, 2006 Published September 7 but body speaks prospectively of August; retain date inconsistency.

Chapters: Noghalt and TaeKwon lineage.

Republished Thai player-council meeting minutes ​

Republished Thai player-council meeting minutes — operator material republication; operator meeting minutes republication. thai_rolc_2006 Document date: 2006-10-11. Access: recorded in existing research no new fetch. Current-state answers and future proposals differ. Future 2007 Ninja roadmap superseded by later February Gunslinger report.

Scope: Meeting September 2, 2006; published October 11.

Meeting September 2, 2006; published October 11 Current-state answers and future proposals differ. Future 2007 Ninja roadmap superseded by later February Gunslinger report.

Chapters: Noghalt and TaeKwon lineage.

Thai Gunslinger rollout announcement report ​

Thai Gunslinger rollout announcement report — contemporary reporting; news or feature report. thai_gunslinger_notice Access: recorded in existing research no new fetch. Gives a before-bound for Ninja, not exact 10.4.1 release date.

Scope: Thai 10.4 part 2 scheduled February 27, 2007; Ninja already present.

Thai 10.4 part 2 scheduled February 27, 2007; Ninja already present Gives a before-bound for Ninja, not exact 10.4.1 release date.

Chapters: Hugel / 10.4.1 The Secret Warrior and Ninja, 10.4.2 The God of Bullet: Gunslinger.

Thai Gunslinger quest guide ​

Thai Gunslinger quest guide — contemporary reporting; player guide. thai_gunslinger_guide Access: recorded in existing research no new fetch. Do not assume every descriptive skill claim is measured server behavior.

Scope: Thai Gunslinger job quest and February 27, 2007 announcement.

Thai Gunslinger job quest and February 27, 2007 announcement Do not assume every descriptive skill claim is measured server behavior.

Chapters: 10.4.2 The God of Bullet: Gunslinger.

Thai Veins announcement and update report ​

Thai Veins announcement and update report — contemporary reporting; news or feature report. thai_veins_notice Access: recorded in existing research no new fetch. Warns Thai boss HP may already have been changed. Images now placeholders; full numerical tables not recovered.

Scope: Thai Episode 11.2 scheduled September 18, 2007.

Thai Episode 11.2 scheduled September 18, 2007 Warns Thai boss HP may already have been changed. Images now placeholders; full numerical tables not recovered.

Chapters: Veins.

Thai Brynhild gameplay test ​

Thai Brynhild gameplay test — contemporary reporting; gameplay test report. thai_brynhild_test Document date: 2009-05-23. Access: recorded in existing research no new fetch. Publication is a latest bound, not launch date. Author tests item behavior.

Scope: Thai Episode 13.1 already live by May 23, 2009.

Thai Episode 13.1 already live by May 23, 2009 Publication is a latest bound, not launch date. Author tests item behavior.

Chapters: Ash Vacuum / New World.

Thai Episode 13.2 gameplay feature report ​

Thai Episode 13.2 gameplay feature report — contemporary reporting; news or feature report. thai_unknown_guide Document date: 2009-11-02. Access: recorded in existing research no new fetch. Launch day remains unknown; separate contemporary evidence establishes Thai 13.2 availability by September 30, 2009. The November 2 guide supplies content descriptions, not the launch date.

Scope: Thai Episode 13.2 already live by November 2, 2009.

Launch day remains unknown; separate evidence establishes availability by September 30, 2009. This later guide supports feature descriptions.

Chapters: 13.2 Encounter / The Unknown, Final pre-Renewal maintenance state.

Thai Class 3 and Renewal rollout notice ​

Thai Class 3 and Renewal rollout notice — thai operator original; operator announcement. thai_renewal_original Document date: 2010-11-05. Archive capture: 2010-11-11. Access: archived or live html recovered and inspected. Notice confirms planned cutover, not exact maintenance completion. November 11 capture; excludes Renewal from target. Saved HTML

Scope: Published November 5, 2010: November 9 Class3 and Renewal; client EP13.2.1.

Original URL · Archive capture

Published November 5, 2010: November 9 Class3 and Renewal; client EP13.2.1 Notice confirms planned cutover, not exact maintenance completion. November 11 capture; excludes Renewal from target.

Chapters: Final pre-Renewal maintenance state.

Thai Renewal launch-day event report ​

Thai Renewal launch-day event report — contemporary reporting; news or feature report. thai_renewal_day Document date: 2010-11-09. Access: recorded in existing research no new fetch. Corroborates launch-day context, not every server completion time.

Scope: November 9, 2010 Renewal welcome reset event.

November 9, 2010 Renewal welcome reset event Corroborates launch-day context, not every server completion time.

Chapters: Final pre-Renewal maintenance state.

iRO Nameless Island update description ​

iRO Nameless Island update description — foreign operator original; patch description or patch note. iro_nameless Access: recorded in existing research no new fetch. iRO regional reference; not Thai release date or complete Thai changelog.

Scope: Nameless Island content reference.

Nameless Island content reference iRO regional reference; not Thai release date or complete Thai changelog.

Chapters: Nameless Island.

iRO Moscovia update description ​

iRO Moscovia update description — foreign operator original; patch description or patch note. iro_moscovia Access: recorded in existing research no new fetch. iRO date must not be transferred to Thailand.

Scope: Moscovia content reference.

Moscovia content reference iRO date must not be transferred to Thailand.

Chapters: Moscovia regional addition.

iRO Episode 12 system update description ​

iRO Episode 12 system update description — foreign operator original; patch description or patch note. iro_late_systems Access: recorded in existing research no new fetch. Not proof Thai systems arrived together.

Scope: Episode 12 system reference.

Episode 12 system reference Not proof Thai systems arrived together.

Cross-cutting research/comparison source; not assigned as proof of a particular Thai patch.

iRO Ash Vacuum update description ​

iRO Ash Vacuum update description — foreign operator original; patch description or patch note. iro_ash Access: recorded in existing research no new fetch. iRO release June 9, 2009 is not Thai release; Thai already-live report predates it.

Scope: New World expedition content reference.

New World expedition content reference iRO release June 9, 2009 is not Thai release; Thai already-live report predates it.

Chapters: Ash Vacuum / New World.

iRO Episode 13.2 update description ​

iRO Episode 13.2 update description — foreign operator original; patch description or patch note. iro_unknown Access: recorded in existing research no new fetch. Not Thai release date.

Scope: 13.2 New World extension content reference.

13.2 New World extension content reference Not Thai release date.

Chapters: 13.2 Encounter / The Unknown.

Archived Thai leveling and recovery-condition guide ​

Archived Thai leveling and recovery-condition guide — thai operator original; operator guide. thai_guide_2003_level Archive capture: 2003-12-12. Access: archived or live html recovered and inspected. Documents red-weight recovery suppression, first-hit EXP example and additional-attacker bonus. Does not provide natural HP/SP formula. Party description is internally inconsistent. Not proof of September 2002 CBT behavior. Saved HTML

Scope: Thai operator documentation preserved December 12, 2003; publication/effective date absent.

Original URL · Archive capture

Thai operator documentation preserved December 12, 2003; publication/effective date absent Documents red-weight recovery suppression, first-hit EXP example and additional-attacker bonus. Does not provide natural HP/SP formula. Party description is internally inconsistent. Not proof of September 2002 CBT behavior.

Chapters: Turtle Island and WoE.

Archived Thai recovery-item database ​

Archived Thai recovery-item database — thai operator original; reference database. thai_guide_2003_recovery_items Archive capture: 2003-12-13. Access: archived or live html recovered and inspected. Approximate healing descriptions, prices and weights; no min/max rolls, scaling or effective patch date. Page may retain older content. Never treat capture date as a production-state date. Saved HTML

Scope: Thai recovery-item descriptions preserved December 13, 2003.

Original URL · Archive capture

Thai recovery-item descriptions preserved December 13, 2003 Approximate healing descriptions, prices and weights; no min/max rolls, scaling or effective patch date. Page may retain older content. Never treat capture date as a production-state date.

Cross-cutting research/comparison source; not assigned as proof of a particular Thai patch.

Archived Thai card database ​

Archived Thai card database — thai operator original; reference database. thai_guide_2003_cards Archive capture: 2003-12-13. Access: archived or live html recovered and inspected. Old candidate effects; no patch/version provenance, and neighboring guide pages contain unimplemented features. Cannot establish when the listed effects were live. Saved HTML

Scope: Thai card descriptions preserved December 13, 2003.

Original URL · Archive capture

Thai card descriptions preserved December 13, 2003 Old candidate effects; no patch/version provenance, and neighboring guide pages contain unimplemented features. Cannot establish when the listed effects were live.

Cross-cutting research/comparison source; not assigned as proof of a particular Thai patch.

March 2002 player discussion of SP recovery ​

March 2002 player discussion of SP recovery — community research; player discussion. jp_sp_discussion_20020301 Document date: 2002-03-01. Access: archived or live html recovered and inspected. Reposted attribution to an Acolyte thread and homepage2.nifty.com/yoan. Approximate seconds per 1 SP; standing and sitting table. Region/build not authenticated, no HP formula or high-INT cap. Not Thai CBT proof.

Scope: Japanese-language early-beta discussion, March 1, 2002 post 8.

Japanese-language early-beta discussion, March 1, 2002 post 8 Reposted attribution to an Acolyte thread and homepage2.nifty.com/yoan. Approximate seconds per 1 SP; standing and sitting table. Region/build not authenticated, no HP formula or high-INT cap. Not Thai CBT proof.

Chapters: Beta 1: skills and Mage era.

Indexed contents of a retrospective Thai RO book ​

Indexed contents of a retrospective Thai RO book — retrospective reference; news or update index. thai_episode_book_toc Access: search excerpt only; direct PDF 404; historical chapters unread. Only search-indexed contents inspected; direct PDF currently returns 404. Full historical chapters not read. Secondary numbering lead, not evidence for patch dates or numerical mechanics. Ayothaya labelled 8.0; early labels differ from operator-notice mirror.

Scope: Retrospective Thai Ragnarok episode chapter labels, Part 2 TRO Episode Update List, page 15.

Retrospective Thai Ragnarok episode chapter labels, Part 2 TRO Episode Update List, page 15 Only search-indexed contents inspected; direct PDF currently returns 404. Full historical chapters not read. Secondary numbering lead, not evidence for patch dates or numerical mechanics. Ayothaya labelled 8.0; early labels differ from operator-notice mirror.

Chapters: Comodo, Turtle Island and WoE, Juno and alternate second jobs, Amatsu, Forging, potion-making and element-table update, Gonryun, Marriage and Super Novice, Umbala and Niflheim, Louyang, Jawaii honeymoon addition, Ayothaya, Rebirth and transcendent jobs, Nameless Island.

Archived Thai operator news index with Einbroch notices ​

Archived Thai operator news index with Einbroch notices — thai operator original; news or update index. thai_news_index_20050928 Archive capture: 2005-10-19. Access: original index or intro recovered; related schedule bodies now recovered. Index/microsite evidence is supplemented by recovered original schedule and manual-patch bodies in round 5. October 17 is a schedule, not confirmed deployment completion. Saved HTML

Scope: Thai EP10.1 schedule announcement and manual-patch notice listed September 28, 2005.

Original URL · Archive capture

Index/microsite evidence is supplemented by recovered original schedule and manual-patch bodies in round 5. October 17 is a schedule, not confirmed deployment completion.

Chapters: Rebirth and transcendent jobs, Official multiple-client support, Novice Guild War on main servers, Einbroch.

Thai Episode 10.1 promotional microsite introduction ​

Thai Episode 10.1 promotional microsite introduction — thai operator original; promotional microsite intro. thai_einbroch_microsite Archive capture: 2005-10-29. Access: original index or intro recovered; related schedule bodies now recovered. Index/microsite evidence is supplemented by recovered original schedule and manual-patch bodies in round 5. October 17 is a schedule, not confirmed deployment completion. Saved HTML

Scope: Thai title RO Episode 10.1 The City of Steel.

Original URL · Archive capture

Index/microsite evidence is supplemented by recovered original schedule and manual-patch bodies in round 5. October 17 is a schedule, not confirmed deployment completion.

Chapters: Einbroch.

December 2005 Gravity developer interview ​

December 2005 Gravity developer interview — contemporary reporting; interview. thai_gravity_interview_20051208 Document date: 2005-12-08. Access: recorded in existing research no new fetch. Availability bound only. Article title refers to 2006 plans; publication is 2005. Future plans are not patch deployments.

Scope: Thai version explicitly 10.1 while Korea is 10.3, interview published December 8, 2005.

Thai version explicitly 10.1 while Korea is 10.3, interview published December 8, 2005 Availability bound only. Article title refers to 2006 plans; publication is 2005. Future plans are not patch deployments.

Chapters: Einbroch.

Thai Episode 12.1 same-day deployment report ​

Thai Episode 12.1 same-day deployment report — contemporary reporting; news or feature report. thai_morroc_deployment_20080916 Document date: 2008-09-16. Access: archived or live html recovered and inspected. Report does not prove every server completion time or full numeric database. Its battleground team size and map-count descriptions require corroboration before code changes.

Scope: Thailand EP12.1 reported updated September 16, 2008: Morroc, battlegrounds, Moscovia and cards.

Thailand EP12.1 reported updated September 16, 2008: Morroc, battlegrounds, Moscovia and cards Report does not prove every server completion time or full numeric database. Its battleground team size and map-count descriptions require corroboration before code changes.

Chapters: EP12.1: Destruction of Morroc and battlegrounds, Moscovia regional addition.

Thai Episode 12.2 same-day deployment report ​

Thai Episode 12.2 same-day deployment report — contemporary reporting; news or feature report. thai_memorial_deployment_20081118 Document date: 2008-11-18. Access: archived or live html recovered and inspected. Reported access/cooldown restrictions are candidates, not runtime verification. Endless Tower floor-count wording is ambiguous; do not derive full floor tables from this report.

Scope: Thailand EP12.2 reported updated November 18, 2008: Endless Tower and Sealed Shrine.

Thailand EP12.2 reported updated November 18, 2008: Endless Tower and Sealed Shrine Reported access/cooldown restrictions are candidates, not runtime verification. Endless Tower floor-count wording is ambiguous; do not derive full floor tables from this report.

Chapters: EP12.2: The Memorial Dungeon.

March 2002 SP-recovery interval discussion ​

March 2002 SP-recovery interval discussion — community research; player discussion. jp_recovery_sp_rate_20020322 Document date: 2002-03-22. Access: live html recovered and inspected. Primary evidence for what these participants wrote at the shown date; not official operator documentation or proof of Thai implementation. The thread title uses 公式 in the sense of formulas; it does not make this an official thread.

Scope: Post 18: a contemporaneous alternative SP interval expression..

Post 18: a contemporaneous alternative SP interval expression. Primary evidence for what these participants wrote at the shown date; not official operator documentation or proof of Thai implementation. The thread title uses 公式 in the sense of formulas; it does not make this an official thread.

Chapters: Beta 1: skills and Mage era.

April 2002 high-INT SP-recovery discussion ​

April 2002 high-INT SP-recovery discussion — community research; player discussion. jp_recovery_sp_highint_20020418 Document date: 2002-04-18. Access: live html recovered and inspected. Primary evidence for what these participants wrote at the shown date; not official operator documentation or proof of Thai implementation. The thread title uses 公式 in the sense of formulas; it does not make this an official thread.

Scope: Post 25: relayed report of INT 126 recovery staying positive..

Post 25: relayed report of INT 126 recovery staying positive. Primary evidence for what these participants wrote at the shown date; not official operator documentation or proof of Thai implementation. The thread title uses 公式 in the sense of formulas; it does not make this an official thread.

Chapters: Beta 1: skills and Mage era.

October 2002 discussion of recovery and server lag ​

October 2002 discussion of recovery and server lag — community research; player discussion. jp_recovery_sp_lag_20021008 Document date: 2002-10-08. Access: live html recovered and inspected. Primary evidence for what these participants wrote at the shown date; not official operator documentation or proof of Thai implementation. The thread title uses 公式 in the sense of formulas; it does not make this an official thread.

Scope: Post 44: contemporaneous warning about server congestion affecting observed recovery..

Post 44: contemporaneous warning about server congestion affecting observed recovery. Primary evidence for what these participants wrote at the shown date; not official operator documentation or proof of Thai implementation. The thread title uses 公式 in the sense of formulas; it does not make this an official thread.

Chapters: Beta 2: Thai-language support for English server.

February 2003 unresolved HP-recovery discussion ​

February 2003 unresolved HP-recovery discussion — community research; player discussion. jp_recovery_hp_unknown_20030214 Document date: 2003-02-14. Access: live html recovered and inspected. Primary evidence for what these participants wrote at the shown date; not official operator documentation or proof of Thai implementation. The thread title uses 公式 in the sense of formulas; it does not make this an official thread.

Scope: Posts 114-115: question about the exact natural HP formula and an explicitly uncertain response..

Posts 114-115: question about the exact natural HP formula and an explicitly uncertain response. Primary evidence for what these participants wrote at the shown date; not official operator documentation or proof of Thai implementation. The thread title uses 公式 in the sense of formulas; it does not make this an official thread.

Chapters: Beta 2: Thai-language support for English server.

May 2003 discussion of Korean SP-recovery changes ​

May 2003 discussion of Korean SP-recovery changes — community research; player discussion. jp_recovery_kro_change_20030513 Document date: 2003-05-13. Access: live html recovered and inspected. Primary evidence for what these participants wrote at the shown date; not official operator documentation or proof of Thai implementation. The thread title uses 公式 in the sense of formulas; it does not make this an official thread.

Scope: Posts 149-150 refer to a Korean SP recovery revision and a calculator for INT 120 and above..

Posts 149-150 refer to a Korean SP recovery revision and a calculator for INT 120 and above. Primary evidence for what these participants wrote at the shown date; not official operator documentation or proof of Thai implementation. The thread title uses 公式 in the sense of formulas; it does not make this an official thread.

Chapters: Juno and alternate second jobs.

Thai Sakray Episode 10.3 NPC guide ​

Thai Sakray Episode 10.3 NPC guide — contemporary reporting; player guide. thai_noghalt_sakray_npc_guide_20060808 Document date: 2006-08-08. Access: web tool text inspected; direct fetch limitations in round4 packet. No exact production rollout date. Some coordinates have malformed BBCode/text; consult original figures or scripts before implementation.

Scope: Explicit Thai Sakray; not main-server release confirmation.

Explicit Thai Sakray; not main-server release confirmation No exact production rollout date. Some coordinates have malformed BBCode/text; consult original figures or scripts before implementation.

Chapters: Noghalt and TaeKwon lineage.

Thai Sakray Episode 10.2 opening-day report ​

Thai Sakray Episode 10.2 opening-day report — contemporary reporting; news or feature report. thai_lighthalzen_sakray_firstday_20060207 Document date: 2006-02-07. Access: web tool text inspected; direct fetch limitations in round4 packet. Does not confirm February 21 production rollout; GM-spawned demonstration monsters and described damage are not controlled mechanics tests.

Scope: Explicit Thai Sakray.

Explicit Thai Sakray Does not confirm February 21 production rollout; GM-spawned demonstration monsters and described damage are not controlled mechanics tests.

Chapters: Lighthalzen and Homunculus.

Holy Ground access player guide ​

Holy Ground access player guide — contemporary reporting; player guide. thai_holy_ground_access_guide_20070607 Document date: 2007-06-07. Access: web tool text inspected; direct fetch limitations in round4 packet. Not an operator rollout announcement. Language, publication date and mentions of player demand do not establish a Thai main-server launch date.

Scope: Thai-language Episode 11.1 guide; realm not explicitly identified.

Thai-language Episode 11.1 guide; realm not explicitly identified Not an operator rollout announcement. Language, publication date and mentions of player demand do not establish a Thai main-server launch date.

Chapters: Rachel and socket enchanting.

Holy Ground monsters and equipment player guide ​

Holy Ground monsters and equipment player guide — contemporary reporting; player guide. thai_holy_ground_monster_guide_20070613 Document date: 2007-06-13. Access: web tool text inspected; direct fetch limitations in round4 packet. Monster tables were images; plain text does not recover a complete stat/drop table. Advice and values require independent validation. Not a Thai production-date proof.

Scope: Thai-language Episode 11.1 guide; realm not explicitly identified.

Thai-language Episode 11.1 guide; realm not explicitly identified Monster tables were images; plain text does not recover a complete stat/drop table. Advice and values require independent validation. Not a Thai production-date proof.

Chapters: Rachel and socket enchanting.

Survivor equipment guide with Thai operator quest links — contemporary reporting; player guide. thai_survivor_set_guide_20070705 Document date: 2007-07-05. Access: guide text inspected; two linked operator quest bodies not retrieved. Official linked pages were not retrieved during this pass. Do not count the two URLs as recovered official content or use the July article date as a deployment date.

Scope: Thai-language guide linking Thai operator quest library.

Thai-language guide linking Thai operator quest library Official linked pages were not retrieved during this pass. Do not count the two URLs as recovered official content or use the July article date as a deployment date.

Chapters: Rachel and socket enchanting.

Thai Veins preview with conflicting publication timing ​

Thai Veins preview with conflicting publication timing — contemporary reporting; news or feature report. thai_veins_preview_20071019_conflict Document date: 2007-10-19. Access: web tool text inspected; direct fetch limitations in round4 packet. Displayed October 19 date conflicts with the body promising 11.2 within September. Suitable for contemporaneous regional naming, not a precise rollout date or clean availability bound.

Scope: Explicit Thai / Asiasoft with foreign-server comparisons.

Explicit Thai / Asiasoft with foreign-server comparisons Displayed October 19 date conflicts with the body promising 11.2 within September. Suitable for contemporaneous regional naming, not a precise rollout date or clean availability bound.

Chapters: Rachel and socket enchanting.

September 2009 report mentioning Thai Episode 13.2 availability ​

September 2009 report mentioning Thai Episode 13.2 availability — contemporary reporting; news or feature report. thai_132_observed_sept2009 Document date: 2009-09-30. Access: web tool full text read; direct HTML download returned403.

Scope: Thai 13.2 availability bound only.

Thai 13.2 availability bound only A September 30, 2009 article on Korean Class 3 explicitly remarks that Thai RO has pushed patch 13.2. It does not give the Thai launch date. Only that parenthetical concerns Thai deployment; the subsequent Class 3 and Renewal systems concern Korea.

Chapters: 13.2 Encounter / The Unknown.

March 2009 Godly-item preparation guide ​

March 2009 Godly-item preparation guide — contemporary reporting; player guide. thai_godly_guide_mar2009 Document date: 2009-03-09. Access: web tool full text read; direct HTML download returned403.

Scope: 13.1 player-guide lead, not launch dating.

13.1 player-guide lead, not launch dating Thai-language guide prepares readers for Asprika and Brynhild. It describes WoE2 castle economy65+/defense30+ requirements and a 16–20person team recommendation. Introductory preparation language is not evidence of Thai 13.1 launch by this date. Exact regional applicability needs corroboration.

Chapters: Ash Vacuum / New World.

Thai operator homepage captured October 7, 2010 ​

Thai operator homepage captured October 7, 2010 — thai operator original; news or update index. thai_home_index_20101007 Archive capture: 2010-10-07. Access: index HTML recovered; linked detail bodies not recovered. October 7 homepage capture is not the publication date of each notice. Detail bodies remain unrecovered; title dates and teasers do not establish rollout completion. Saved HTML

Scope: Linked original notice titles and teasers only.

Original URL · Archive capture

Original operator homepage lists notice titles and teasers only. October7 is capture date. Individual detail bodies remain unrecovered; their gameplay or activation details cannot be inferred.

Chapters: Final pre-Renewal maintenance state.

Thai operator homepage captured November 10, 2010 ​

Thai operator homepage captured November 10, 2010 — thai operator original; news or update index. thai_home_index_20101110 Archive capture: 2010-11-10. Access: index HTML recovered; linked detail bodies not recovered. Homepage capture date is not notice publication date. Detail notice bodies not recovered. November10 capture is after target cutover; only explicit earlier event dates can be used for preRenewal scheduling. Saved HTML

Scope: Linked original notice titles and teasers only.

Original URL · Archive capture

Original operator homepage captured after the Renewal cutover. Titles and teasers are preserved, but detail bodies remain unrecovered. Only explicit earlier event dates apply before the cutoff.

Chapters: Final pre-Renewal maintenance state.

Thai Isa and Tyr new-server event announcement report ​

Thai Isa and Tyr new-server event announcement report — contemporary reporting; news or feature report. thai_isa_tyr_notice_20040629 Document date: 2004-06-29. Access: web text verified by parent researcher this round. A schedule, not proof of completed launch. Double EXP applies to these new servers, not a change to the worldwide base EXP table.

Scope: Thai Isa and Tyr only; server opening and temporary EXP promotion.

Thai Isa and Tyr only; server opening and temporary EXP promotion A schedule, not proof of completed launch. Double EXP applies to these new servers, not a change to the worldwide base EXP table.

Chapters: Marriage and Super Novice.

English Beta 2 FAQ; No.25, 22 July 2002 ​

English Beta 2 FAQ; No.25, 22 July 2002 — english service operator original; notice. english_beta_faq_20020722 Document date: 2002-07-22. Archive capture: 2002-08-15. Access: original html recovered text inspected. Thai Beta2 is an announced build family, not an authenticated deployed ruleset. Mid-August is tentative and superseded by later launch evidence. Red Potion 50→60z is explicitly a hypothetical example. Saved HTML

Scope: Thai-language English Beta 2 support; section6 describes planned Thai service.

Original URL · Archive capture

Thai Beta2 is an announced build family, not an authenticated deployed ruleset. Mid-August is tentative and superseded by later launch evidence. Red Potion 50→60z is explicitly a hypothetical example.

Chapters: Beta 2: Thai-language support for English server, Thai closed beta.

Bug report; No.23, 18 July 2002 ​

Bug report; No.23, 18 July 2002 — english service operator original; notice. english_beta_bugreport_20020718 Document date: 2002-07-18. Archive capture: 2002-09-17. Access: original html recovered text inspected. Defect reports are not intended design rules. No Thai CBT applicability established. Saved HTML

Scope: English Beta 2 service; some defects also reported in Korea.

Original URL · Archive capture

Defect reports are not intended design rules. No Thai CBT applicability established.

Chapters: Beta 2: Thai-language support for English server.

Training Ground and new-map fixes; No.18, 17 July 2002 ​

Training Ground and new-map fixes; No.18, 17 July 2002 — english service operator original; notice. english_beta_training_fixes_20020717 Document date: 2002-07-17. Archive capture: 2003-03-20. Access: original html recovered text inspected. 07:20 Thailand time is an as-of status statement, not independently measured deployment completion. Does not prove all later defects fixed. Saved HTML

Scope: English service supported by Thai operator.

Original URL · Archive capture

07:20 Thailand time is an as-of status statement, not independently measured deployment completion. Does not prove all later defects fixed.

Chapters: Beta 2: Thai-language support for English server.

Rollback announcement; No.22, 18 July 2002 ​

Rollback announcement; No.22, 18 July 2002 — english service operator original; notice. english_beta_rollback_20020718 Document date: 2002-07-18. Archive capture: 2002-09-19. Access: original html recovered text inspected. Scheduled shutdown and rollback, not completed-operation proof. Thai item name เสื้อขนมิ้งค์ is not bound to an item ID or precise old/new price. Saved HTML

Scope: English Beta 2 service.

Original URL · Archive capture

Scheduled shutdown and rollback, not completed-operation proof. Thai item name เสื้อขนมิ้งค์ is not bound to an item ID or precise old/new price.

Chapters: Beta 2: Thai-language support for English server.

Thai server progress announcement, 31 August 2002 ​

Thai server progress announcement, 31 August 2002 — thai operator original; notice. thai_progress_20020831 Document date: 2002-08-31. Archive capture: 2002-10-12. Access: original html recovered text inspected. Prelaunch plans and testing. No production mechanics or exact launch date. Date2545 converted to2002. Saved HTML

Scope: Thai service preparation.

Original URL · Archive capture

Prelaunch plans and testing. No production mechanics or exact launch date. Date2545 converted to2002.

Chapters: Thai closed beta.

Thai client download notice; No.46, 14 September 2002 ​

Thai client download notice; No.46, 14 September 2002 — thai operator original; notice. thai_client_download_20020914 Document date: 2002-09-14. Archive capture: 2004-01-14. Access: original html recovered text inspected. No executable/build number, checksum or mechanics specification in this notice. Saved HTML

Scope: Thai client distribution before CBT.

Original URL · Archive capture

No executable/build number, checksum or mechanics specification in this notice.

Chapters: Thai closed beta.

Thai first-job guide, undated ​

Thai first-job guide, undated — thai operator original; guide. thai_firstjobs_guide_2003 Archive capture: 2003-12-12. Access: original html recovered text inspected. Undated; stale conditional wording about future quest functionality. Capture date is not effective date. Saved HTML

Scope: Thai operator documentation preserved12December2003.

Original URL · Archive capture

Undated; stale conditional wording about future quest functionality. Capture date is not effective date.

Cross-cutting research/comparison source; not assigned as proof of a particular Thai patch.

Thai Swordman guide and HP recovery table, undated ​

Thai Swordman guide and HP recovery table, undated — thai operator original; guide. thai_swordman_guide_2003 Archive capture: 2003-12-13. Access: original html recovered text inspected. Passive skill, not natural regeneration. Flat table conflicts with BEEhive Beta2 MaxHP-scaling account; may be stale or incomplete. Does not authenticate Thai CBT behavior. Saved HTML

Scope: Thai operator documentation preserved13December2003.

Original URL · Archive capture

Passive skill, not natural regeneration. Flat table conflicts with BEEhive Beta2 MaxHP-scaling account; may be stale or incomplete. Does not authenticate Thai CBT behavior.

Chapters: Thai closed beta, Thai open beta.

Thai Mage guide and SP recovery table, undated ​

Thai Mage guide and SP recovery table, undated — thai operator original; guide. thai_mage_guide_2003 Archive capture: 2003-12-13. Access: original html recovered text inspected. Passive skill, not natural regeneration. No explicit MaxSP term in printed table does not prove production lacked one. Undated; Thai CBT applicability unresolved. Saved HTML

Scope: Thai operator documentation preserved13December2003.

Original URL · Archive capture

Passive skill, not natural regeneration. No explicit MaxSP term in printed table does not prove production lacked one. Undated; Thai CBT applicability unresolved.

Chapters: Thai closed beta, Thai open beta.

กำหนดการอัพเดท Episode 10.1 The City of Steel ​

กำหนดการอัพเดท Episode 10.1 The City of Steel — thai operator original; notice. thai_einbroch_schedule_original_20050928 Document date: 2005-09-28. Archive capture: 2005-10-23. Access: text body read. Explicit schedule, not successful deployment confirmation. Some prose such as the first-city description is promotional; retain independently verified geography. Saved HTML

Scope: Original Thai Sakray/main schedule and announced content.

Original URL · Archive capture

Explicit schedule, not successful deployment confirmation. Some prose such as the first-city description is promotional; retain independently verified geography.

Chapters: Einbroch.

Update Patch 10.1 สำหรับผู้ที่ลงแผ่น High Class ​

Update Patch 10.1 สำหรับผู้ที่ลงแผ่น High Class — thai operator original; notice. thai_einbroch_manual_original Archive capture: 2005-10-27. Access: text body read. Index lists 2005-09-28; body has no separate publication stamp. Staged client downloads do not prove early feature activation. Saved HTML

Scope: Original Thai main-server schedule repeated in client preparation notice.

Original URL · Archive capture

Index lists 2005-09-28; body has no separate publication stamp. Staged client downloads do not prove early feature activation.

Chapters: Einbroch.

Client Patch ประจำวันที่ 18 กรกฎาคม 2548 (High Class) ​

Client Patch ประจำวันที่ 18 กรกฎาคม 2548 (High Class) — thai operator original; notice. thai_highclass_client_20050718_original Document date: 2005-07-18. Archive capture: 2005-12-30. Access: text body read. Date appears in title and index. Four filenames authenticate the listed client package names, not full server behavior or successful deployment. Binaries were not downloaded or run. Saved HTML

Scope: Thai High-Class client patch notice.

Original URL · Archive capture

Date appears in title and index. Four filenames authenticate the listed client package names, not full server behavior or successful deployment. Binaries were not downloaded or run.

Chapters: Rebirth and transcendent jobs.

Ragnarok Multiple Client ​

Ragnarok Multiple Client — thai operator original; notice. thai_multiclient_original_20050906 Document date: 2005-09-06. Archive capture: 2005-12-04. Access: text body read. September 7 is the required patch date in the notice. No independent runtime test or successful deployment completion. Resource-based practical window count is not an infinite-session guarantee. Saved HTML

Scope: Original Thai client feature and patch requirement.

Original URL · Archive capture

September 7 is the required patch date in the notice. No independent runtime test or successful deployment completion. Resource-based practical window count is not an infinite-session guarantee.

Chapters: Official multiple-client support.

ประกาศ จำนวนเงิน Zeny สูงสุดที่ผู้เล่นสามารถมีได้ในแต่ละตัวละคร ​

ประกาศ จำนวนเงิน Zeny สูงสุดที่ผู้เล่นสามารถมีได้ในแต่ละตัวละคร — thai operator original; notice. thai_zeny_limit_original_20050830 Document date: 2005-08-30. Archive capture: 2005-09-30. Access: text body read. Notice states 2,147 million, rounded wording. It does not authenticate an exact 2,147,483,647 limit, integer representation, overflow algorithm or date the cap was introduced. Saved HTML

Scope: Original Thai per-character currency warning.

Original URL · Archive capture

Notice states 2,147 million, rounded wording. It does not authenticate an exact 2,147,483,647 limit, integer representation, overflow algorithm or date the cap was introduced.

Chapters: Rebirth and transcendent jobs.

Kafra Shop Update 5/10/53 ​

Kafra Shop Update 5/10/53 — thai operator original; notice. thai_kafra_shop_original_20101005 Document date: 2010-10-05. Archive capture: 2010-10-09. Access: text body read. Two earlier product names/descriptions are image-based and not read. Pegasus text lists possible rewards, not probabilities. P denotes the source price unit; do not convert it to zeny. Saved HTML

Scope: Thai main/free-server shop offer.

Original URL · Archive capture

Two earlier product names/descriptions are image-based and not read. Pegasus text lists possible rewards, not probabilities. P denotes the source price unit; do not convert it to zeny.

Chapters: Final pre-Renewal maintenance state.

Special IP Bonus ต้อนรับปิดเทอม ​

Special IP Bonus ต้อนรับปิดเทอม — thai operator original; notice. thai_cafe_bonus_original_20101004 Document date: 2010-10-04. Archive capture: 2010-10-10. Access: text body read. Event eligibility is @Cafe. Exact boundary times and stacking with other boosts are not specified. This is not a permanent base-rate change. Saved HTML

Scope: Temporary @Cafe-only Thai promotion.

Original URL · Archive capture

Event eligibility is @Cafe. Exact boundary times and stacking with other boosts are not specified. This is not a permanent base-rate change.

Chapters: Final pre-Renewal maintenance state.

Trader Live! แลกสนั่น รับสนุก ​

Trader Live! แลกสนั่น รับสนุก — thai operator original; notice. thai_trader_live_original_20100914 Document date: 2010-09-14. Archive capture: 2010-09-24. Access: text body read. Published schedule and rules, not proof each session occurred. Random reward probabilities absent. Saved HTML

Scope: Thai GM event with named realm schedule.

Original URL · Archive capture

Published schedule and rules, not proof each session occurred. Random reward probabilities absent.

Chapters: Final pre-Renewal maintenance state.

Manual Patch สำหรับ Big Update Class 3 ​

Manual Patch สำหรับ Big Update Class 3 — thai operator original; notice. thai_class3_manual_original Archive capture: 2010-11-15. Access: text body read. Capture November 15 is after target cutover. Body reiterates November 9 update but supplies no publication date; neither download instructions nor capture prove activation time. Saved HTML

Scope: Thai Renewal boundary/client preparation.

Original URL · Archive capture

Capture November 15 is after target cutover. Body reiterates November 9 update but supplies no publication date; neither download instructions nor capture prove activation time.

Chapters: Final pre-Renewal maintenance state.

กิจกรรม RO Retro ​

กิจกรรม RO Retro — thai operator original; notice. thai_retro_event_original_20101011 Document date: 2010-10-11. Archive capture: 2010-10-13. Access: text body read. Nostalgia quotations are examples for a contest, not authenticated historical potion/warp prices. Event award publication is after the target cutoff. Saved HTML

Scope: Thai promotional event spanning Renewal cutoff.

Original URL · Archive capture

Nostalgia quotations are examples for a contest, not authenticated historical potion/warp prices. Event award publication is after the target cutoff.

Chapters: Final pre-Renewal maintenance state.

RO Infinity Friendship มิตรภาพไม่มีที่สิ้นสุด ​

RO Infinity Friendship มิตรภาพไม่มีที่สิ้นสุด — thai operator original; page body images unread. thai_friendship_html_original Archive capture: 2010-10-13. Access: html read body is external images not recovered. HTML wrapper recovered; substantive body is two external images that were not recovered or read. Do not mark complete notice-content recovery. Saved HTML

Scope: Original Thai event wrapper with external image body.

Original URL · Archive capture

HTML wrapper recovered; substantive body is two external images that were not recovered or read. Do not mark complete notice-content recovery.

Chapters: Final pre-Renewal maintenance state.

Thai operator homepage captured March 15, 2009 ​

Thai operator homepage captured March 15, 2009 — thai operator original; index. thai_home_index_20090315 Archive capture: 2009-03-15. Access: index read. March 3 is an index-listed document date. Detail body and activation date remain unverified. Saved HTML

Scope: Original Thai news index listing March 3 Episode 13.1 notice.

Original URL · Archive capture

March 3 is an index-listed document date. Detail body and activation date remain unverified.

Chapters: Ash Vacuum / New World.

Thai operator homepage captured September 7, 2009 ​

Thai operator homepage captured September 7, 2009 — thai operator original; index. thai_home_index_20090907 Archive capture: 2009-09-07. Access: index read. No 13.2 launch notice appears among this homepage subset. Omission from a short index is not absence of deployment evidence. Saved HTML

Scope: Original Thai news/event index.

Original URL · Archive capture

No 13.2 launch notice appears among this homepage subset. Omission from a short index is not absence of deployment evidence.

Chapters: Final pre-Renewal maintenance state.

Novice Guild War main-server rollout and rules ​

Novice Guild War main-server rollout and rules — thai operator original; archived original operator notice. thai_novice_guild_war_original_20050926 Document date: 2005-09-26. Archive capture: 2005-10-13. Access: text body read. The captured HTML incorporates a September30 amendment and undated guild-master restriction. The embedded schedule table was recovered and viewed from a December12 capture; city-map images remain unread. Main-server rollout is explicitly a test and rewards remain to be announced. Saved HTML

Scope: Original Thai operator notice.

Original URL · Archive capture

The captured HTML incorporates a September30 amendment and undated guild-master restriction. The embedded schedule table was recovered and viewed from a December12 capture; city-map images remain unread. Main-server rollout is explicitly a test and rewards remain to be announced.

Chapters: Novice Guild War on main servers.

Ragnarok account registration moves to Asiasoft Passport ​

Ragnarok account registration moves to Asiasoft Passport — thai operator original; archived original operator notice. thai_asiasoft_passport_registration_original_20050906 Document date: 2005-09-06. Archive capture: 2005-09-30. Access: text body read. Body header September6 disagrees with index September5. Effective schedule is explicit; successful switch unconfirmed. Saved HTML

Scope: Original Thai operator notice.

Original URL · Archive capture

Body header September6 disagrees with index September5. Effective schedule is explicit; successful switch unconfirmed.

Chapters: Rebirth and transcendent jobs.

nProtect PRO and login-pattern enforcement notice ​

nProtect PRO and login-pattern enforcement notice — thai operator original; archived original operator notice. thai_login_ban_policy_original_20050831 Document date: 2005-08-31. Archive capture: 2005-09-30. Access: text body read. An operator enforcement policy and reported anti-cheat behavior, not emulator gameplay parity or instructions to deploy anti-cheat. Saved HTML

Scope: Original Thai operator notice.

Original URL · Archive capture

An operator enforcement policy and reported anti-cheat behavior, not emulator gameplay parity or instructions to deploy anti-cheat.

Chapters: Rebirth and transcendent jobs.

Emperium War and Novice Guild War schedules effective October25,2005 ​

Emperium War and Novice Guild War schedules effective October25,2005 — thai operator original; archived original operator notice. thai_emperium_war_schedule_original_20051025 Archive capture: 2005-10-24. Access: text body read. Body header says September13,2005; source index says October13,2005. Preserve conflict. October25 effective schedule is explicit, successful deployment unconfirmed. Saved HTML

Scope: Original Thai operator notice.

Original URL · Archive capture

Body header says September13,2005; source index says October13,2005. Preserve conflict. October25 effective schedule is explicit, successful deployment unconfirmed.

Chapters: Novice Guild War on main servers, Einbroch.

Cumulative High Class client patch, later November24 capture ​

Cumulative High Class client patch, later November24 capture — thai operator original; archived original operator notice. thai_highclass_cumulative_client_original_20051124 Archive capture: 2005-11-24. Access: text body read. Index date September9,2005 is not the date of every statement in this mutable page. Body says Multiple Login 7/11/2548; retain verbatim as a later-edited date claim, not proof overriding the separate September7 notice. Saved HTML

Scope: Original Thai operator notice.

Original URL · Archive capture

Index date September9,2005 is not the date of every statement in this mutable page. Body says Multiple Login 7/11/2548; retain verbatim as a later-edited date claim, not proof overriding the separate September7 notice.

Chapters: Rebirth and transcendent jobs, Official multiple-client support.

Cumulative client patch for High Class CD installations ​

Cumulative client patch for High Class CD installations — thai operator original; archived original operator notice. thai_highclass_cumulative_client_original_20050810 Archive capture: 2005-11-25. Access: text body read. August10 index date only; recovered body carries no dated patch manifest or gameplay change list. Saved HTML

Scope: Original Thai operator notice.

Original URL · Archive capture

August10 index date only; recovered body carries no dated patch manifest or gameplay change list.

Chapters: Rebirth and transcendent jobs.

July25,2005 login-screen and patch-client manifest ​

July25,2005 login-screen and patch-client manifest — thai operator original; archived original operator notice. thai_client_login_screen_original_20050725 Document date: 2005-07-25. Archive capture: 2005-12-06. Access: text body read. Client file names and compatibility support; not a gameplay content manifest or independently verified deployment. Saved HTML

Scope: Original Thai operator notice.

Original URL · Archive capture

Client file names and compatibility support; not a gameplay content manifest or independently verified deployment.

Chapters: Rebirth and transcendent jobs.

ประกาศ : รับสมัคร Mirror Site ​

ประกาศ : รับสมัคร Mirror Site — thai operator original; archived original operator notice. thai_mirror_recruitment_20020913 Document date: 2002-09-13. Archive capture: 2002-09-23. Access: text body read. The September 13 notice recruits Thai-client mirror sites and schedules physical software collection from September 14 at 09:00. It does not identify a server patch or executable build. Saved HTML

Scope: Thai prelaunch client distribution.

Original URL · Archive capture

The September 13 notice recruits Thai-client mirror sites and schedules physical software collection from September 14 at 09:00. It does not identify a server patch or executable build.

Chapters: Thai closed beta.

การเพิ่มจำนวน ID ในการเข้าร่วมทดสอบ Ragnarok Thai Close Beta ​

การเพิ่มจำนวน ID ในการเข้าร่วมทดสอบ Ragnarok Thai Close Beta — thai operator original; archived original operator notice. thai_cbt_extra_ids_20020920 Document date: 2002-09-20. Archive capture: 2004-01-12. Access: text body read. The September 20 notice retrospectively states Thai CBT has operated since September 16 at 18:00. It announces additional limited client-CD/ID distribution beginning September 21. It provides no recovery formula. Saved HTML

Scope: Thai closed beta.

Original URL · Archive capture

The September 20 notice retrospectively states Thai CBT has operated since September 16 at 18:00. It announces additional limited client-CD/ID distribution beginning September 21. It provides no recovery formula.

Chapters: Thai closed beta.

คำชี้แจงเกี่ยวกับการใช้สิทธิเกม Ragnarok Online ​

คำชี้แจงเกี่ยวกับการใช้สิทธิเกม Ragnarok Online — thai operator original; archived original operator notice. thai_rights_clarification_20020913 Document date: 2002-09-13. Archive capture: 2002-09-23. Access: text body read. The September 13 clarification discusses posters, fansites, publications and use of the client in internet cafes during Beta. This is an administrative notice, not a gameplay patch, and is preserved as historical policy rather than current legal guidance. Saved HTML

Scope: Thai operator historical administrative policy.

Original URL · Archive capture

The September 13 clarification discusses posters, fansites, publications and use of the client in internet cafes during Beta. This is an administrative notice, not a gameplay patch, and is preserved as historical policy rather than current legal guidance.

Chapters: Thai closed beta.

ประกาศ : การเข้าร่วมเป็นผู้ทดสอบ RO THAI CLOSE BETA ​

ประกาศ : การเข้าร่วมเป็นผู้ทดสอบ RO THAI CLOSE BETA — thai operator original; archived original operator notice. thai_cbt_participation_20020911 Document date: 2002-09-11. Archive capture: 2002-10-04. Access: text body read. The September 11 notice explains preassigned CBT accounts and distribution through partner ISPs or a 149-baht boxed client/manual/ID package. Downloads are scheduled from September 14 at 12:00; partner registration from September 16. It says the client program can continue into OBT. That statement is not character/ID persistence and does not override the separately announced CBT wipe. Saved HTML

Scope: Thai closed-beta participation and client distribution plans.

Original URL · Archive capture

The September 11 notice explains preassigned CBT accounts and distribution through partner ISPs or a 149-baht boxed client/manual/ID package. Downloads are scheduled from September 14 at 12:00; partner registration from September 16. It says the client program can continue into OBT. That statement is not character/ID persistence and does not override the separately announced CBT wipe.

Chapters: Thai closed beta.

ประกาศ : ความคืบหน้าของการดำเนินงาน ​

ประกาศ : ความคืบหน้าของการดำเนินงาน — thai operator original; archived original operator notice. thai_progress_20020812 Document date: 2002-08-12. Archive capture: 2003-11-18. Access: text body read. The August 12 plan schedules server installation August 19–25 and internal testing August 26–31, with opening tentatively in early September. It initially proposes two server sets and Thai Beta 2. A claim that IDs would continue when paid service began is a prelaunch commercial-transition plan, not proof of CBT-to-OBT character retention. No completed installation, testing or opening is confirmed here. Saved HTML

Scope: Thai service preparation, tentative plans.

Original URL · Archive capture

The August 12 plan schedules server installation August 19–25 and internal testing August 26–31, with opening tentatively in early September. It initially proposes two server sets and Thai Beta 2. A claim that IDs would continue when paid service began is a prelaunch commercial-transition plan, not proof of CBT-to-OBT character retention. No completed installation, testing or opening is confirmed here.

Chapters: Thai closed beta.

ประกาศ ฉบับที่ 1 ​

ประกาศ ฉบับที่ 1 — thai operator original; archived original operator notice. thai_initial_announcement_july2002 Archive capture: 2002-07-24. Access: text body read. The recovered first announcement has no explicit publication date in its readable body; the operator index lists July 3, 2002. It reports the Gravity/Asiasoft signing on June 13, 2002, plans Thai Beta 2 around mid-August, and says foreign-server IDs cannot transfer to Thailand. Its broad promise of similar overseas content does not authenticate numerical Thai mechanics. Saved HTML

Scope: Thai service preparation; July 3 index association.

Original URL · Archive capture

The recovered first announcement has no explicit publication date in its readable body; the operator index lists July 3, 2002. It reports the Gravity/Asiasoft signing on June 13, 2002, plans Thai Beta 2 around mid-August, and says foreign-server IDs cannot transfer to Thailand. Its broad promise of similar overseas content does not authenticate numerical Thai mechanics.

Chapters: Thai closed beta.

เปิดการซัพพอร์ตทางอีเมล์อีกครั้งแล้ว ​

เปิดการซัพพอร์ตทางอีเมล์อีกครั้งแล้ว — english service operator original; archived original operator notice. english_support_reopened_20020719 Document date: 2002-07-19. Archive capture: 2002-09-11. Access: text body read. The July 19 notice says email support has reopened after the preceding day's closure. English and Thai support channels are named. It is a service-support notice and does not date a game-mechanics change. Saved HTML

Scope: English service, Thai-language support.

Original URL · Archive capture

The July 19 notice says email support has reopened after the preceding day's closure. English and Thai support channels are named. It is a service-support notice and does not date a game-mechanics change.

Chapters: Beta 2: Thai-language support for English server.

แจ้งเรื่องการดาวน์โหลด patch ของ Beta 2 ​

แจ้งเรื่องการดาวน์โหลด patch ของ Beta 2 — english service operator original; archived original operator notice. english_beta2_patch_requirement_20020717 Document date: 2002-07-17. Archive capture: 2003-01-02. Access: text body read. The July 17 notice warns that skipping required Beta 2 client patches can cause character-stat, second-job and save problems. It is evidence for client/server compatibility requirements, not a numbered patch manifest or HP/SP rule. Saved HTML

Scope: English Beta 2 service, Thai-language operator notice.

Original URL · Archive capture

The July 17 notice warns that skipping required Beta 2 client patches can cause character-stat, second-job and save problems. It is evidence for client/server compatibility requirements, not a numbered patch manifest or HP/SP rule.

Chapters: Beta 2: Thai-language support for English server.

เซิร์ฟเวอร์ภาษาอังกฤษเปิดให้บริการตามปรกติแล้ว ​

เซิร์ฟเวอร์ภาษาอังกฤษเปิดให้บริการตามปรกติแล้ว — english service operator original; archived original operator notice. english_beta2_service_status_20020717 Document date: 2002-07-17. Archive capture: 2003-01-03. Access: text body read. The July 17 notice reports English Chaos and Loki operating normally as of 07:20 Thailand time. This establishes an operational observation by that time, not proof that the scheduled July 16 opening happened on time. Saved HTML

Scope: English Beta 2 service: Chaos and Loki.

Original URL · Archive capture

The July 17 notice reports English Chaos and Loki operating normally as of 07:20 Thailand time. This establishes an operational observation by that time, not proof that the scheduled July 16 opening happened on time.

Chapters: Beta 2: Thai-language support for English server.

เตรียมใช้โปรแกรมป้องกันการแฮ็คกับ Beta 2 ​

เตรียมใช้โปรแกรมป้องกันการแฮ็คกับ Beta 2 — english service operator original; archived original operator notice. korean_nprotect_notice_20020711 Document date: 2002-07-11. Archive capture: 2002-09-21. Access: text body read. The July 11 notice says Gravity and Inca deployed N Protect in Korea; English and Japanese servers were explicitly not changing at that time. Worldwide use was a future plan with no date. Do not mark Thai or English N Protect activation on July 11. Saved HTML

Scope: Korean N Protect deployment described in Thai-language English-support notice.

Original URL · Archive capture

The July 11 notice says Gravity and Inca deployed N Protect in Korea; English and Japanese servers were explicitly not changing at that time. Worldwide use was a future plan with no date. Do not mark Thai or English N Protect activation on July 11.

Chapters: Beta 2: Thai-language support for English server.

Beta 2 เปิดให้ดาวน์โหลดกันแล้ว ​

Beta 2 เปิดให้ดาวน์โหลดกันแล้ว — english service operator original; archived original operator notice. english_beta2_download_schedule_20020711 Document date: 2002-07-11. Archive capture: 2002-07-25. Access: text body read. The July 11 notice announces the Beta 2 client is downloadable and schedules the English service for July 16 at 08:00 Thailand time. Keep this scheduled opening distinct from the July 17 operational-status notice. Saved HTML

Scope: English Beta 2 distribution and opening schedule.

Original URL · Archive capture

The July 11 notice announces the Beta 2 client is downloadable and schedules the English service for July 16 at 08:00 Thailand time. Keep this scheduled opening distinct from the July 17 operational-status notice.

Chapters: Beta 2: Thai-language support for English server.

Infinity Story screenshot event and conditional server-wide rewards ​

Infinity Story screenshot event and conditional server-wide rewards — thai operator original; archived original operator notice. thai_infinity_story_original_20101017 Document date: 2010-10-17. Archive capture: 2010-11-23. Access: text body read. Captured November23 after the event window; text states October17 publication/update. Announced conditional2xrewards have no activation date or completion proof. Saved HTML

Scope: Original Thai operator notice.

Original URL · Archive capture

Captured November23 after the event window; text states October17 publication/update. Announced conditional2xrewards have no activation date or completion proof.

Chapters: Final pre-Renewal maintenance state.

E-Card announcement schedules November9 Renewal and Class3 ​

E-Card announcement schedules November9 Renewal and Class3 — thai operator original; archived original operator notice. thai_renewal_ecard_original_20101017 Document date: 2010-10-17. Archive capture: 2010-10-28. Access: text body read. An additional announcement of the Renewal schedule, not successful rollout confirmation. Renewal content remains excluded. Saved HTML

Scope: Original Thai operator notice.

Original URL · Archive capture

An additional announcement of the Renewal schedule, not successful rollout confirmation. Renewal content remains excluded.

Chapters: Final pre-Renewal maintenance state.

Original Thai quest guide: helping the great wizard ​

Original Thai quest guide: helping the great wizard — thai operator original; archived original operator guide. thai_ice_necklace_quest373_original Archive capture: 2007-06-28. Access: text body read. Guide has no publication date. June28,2007 capture bounds documentation, not release day. User comments are separate community content and were not used for operator claims. The airplane metadata is explicitly a website-map placeholder, not an in-game location. Saved HTML

Scope: Original Thai operator guide.

Original URL · Archive capture

Guide has no publication date. June28,2007 capture bounds documentation, not release day. User comments are separate community content and were not used for operator claims. The airplane metadata is explicitly a website-map placeholder, not an in-game location.

Chapters: Rachel and socket enchanting.

Original Thai quest guide: summoning MVP Ktullanux ​

Original Thai quest guide: summoning MVP Ktullanux — thai operator original; archived original operator guide. thai_ktullanux_quest380_original Archive capture: 2007-07-04. Access: text body read. Guide has no publication date. July4,2007 capture bounds documentation, not release day. Comments excluded. Database and spawn script still need verification; this guide gives one boss HP/property/race and summon-reset rule, not a complete monster/drop database. Saved HTML

Scope: Original Thai operator guide.

Original URL · Archive capture

Guide has no publication date. July4,2007 capture bounds documentation, not release day. Comments excluded. Database and spawn script still need verification; this guide gives one boss HP/property/race and summon-reset rule, not a complete monster/drop database.

Chapters: Rachel and socket enchanting.

Original Thai Episode13.1 Ash Vacuum preview ​

Original Thai Episode13.1 Ash Vacuum preview — thai operator original; archived original operator notice. thai_ash_vacuum_original_preview_20090303 Archive capture: 2009-03-16. Access: text body read. March3 is the homepage-index date only; detail body supplies no publication/deployment date and ends “soon”. March16 capture confirms a preview existed, not Thai launch. Promotional “10times” monster-strength language is not numeric stat-table evidence. Saved HTML

Scope: Original Thai operator notice.

Original URL · Archive capture

March3 is the homepage-index date only; detail body supplies no publication/deployment date and ends “soon”. March16 capture confirms a preview existed, not Thai launch. Promotional “10times” monster-strength language is not numeric stat-table evidence.

Chapters: Ash Vacuum / New World.

Novice Guild War Tuesday/Friday schedule image ​

Novice Guild War Tuesday/Friday schedule image — thai operator original; archived original operator image. thai_novice_war_schedule_image_original Archive capture: 2005-12-12. Access: pixels viewed. Embedded asset from the September26 notice; actual recovered image capture is December12,2005. Pixels show Tuesday and Friday18:00–20:00. Image capture alone cannot date the first announcement or establish a later active schedule. The October25 schedule-change notice remains separate. Saved image

Scope: Original Thai operator schedule image; capture date does not establish the active timetable.

Original URL · Archive capture

Embedded asset from the September26 notice; actual recovered image capture is December12,2005. Pixels show Tuesday and Friday18:00–20:00. Image capture alone cannot date the first announcement or establish a later active schedule. The October25 schedule-change notice remains separate.

Chapters: Novice Guild War on main servers.

Asiasoft second announcement with translated Gravity closure statements ​

Asiasoft second announcement with translated Gravity closure statements — thai operator original; archived original operator notice. thai_second_announcement_aug2002 Archive capture: 2003-05-16. Access: text body read. The original Asiasoft page contains Thai translations of Gravity statements dated August 3 and August 6, 2002. The outer article is undated; its index lists August 9. It discusses English/international-server closure: the exact shutdown time was not fixed, and the later statement clarifies that three months was a contingency rather than a fixed duration. An August opening forecast for Thailand in the quoted statement is superseded by the September launch evidence. This is service chronology, not a recovery patch. Saved HTML

Scope: Thai operator explanation of English/international service closure; embedded Gravity translations.

Original URL · Archive capture

The original Asiasoft page contains Thai translations of Gravity statements dated August 3 and August 6, 2002. The outer article is undated; its index lists August 9. It discusses English/international-server closure: the exact shutdown time was not fixed, and the later statement clarifies that three months was a contingency rather than a fixed duration. An August opening forecast for Thailand in the quoted statement is superseded by the September launch evidence. This is service chronology, not a recovery patch.

Chapters: Thai closed beta.

Temporary email-support closure; No.21, 18 July 2002 ​

Temporary email-support closure; No.21, 18 July 2002 — english service operator original; archived original operator notice. english_support_closed_20020718 Document date: 2002-07-18. Archive capture: 2002-11-09. Access: text body read. The July 18 notice temporarily closes email support and promises a later reopening announcement without a time. The separately recovered July 19 notice confirms reopening. Neither is a gameplay-mechanics patch. Saved HTML

Scope: English service with Thai-language support.

Original URL · Archive capture

The July 18 notice temporarily closes email support and promises a later reopening announcement without a time. The separately recovered July 19 notice confirms reopening. Neither is a gameplay-mechanics patch.

Chapters: Beta 2: Thai-language support for English server.

Thai operator basic-play guide,undated ​

Thai operator basic-play guide,undated — thai operator original; archived original operator guide. thai_basic_guide_2003 Archive capture: 2003-12-12. Access: text body read. The undated basic guide places its HP statement after two death options: return to the last saved point or wait for another player to revive you. It then says Novice HP is 50% and other classes have 1 HP, without separating the two routes or naming Resurrection skill levels. Treat this as ambiguous death/revival documentation, not a universal resurrection formula or natural recovery. The same page describes 1% Base/Job loss but leaves the EXP denominator and rounding unspecified; no Thai beta effective date is known. Saved HTML

Scope: Original Thai operator guide captured December 12, 2003; effective build unknown.

Original URL · Archive capture

The undated basic guide places its HP statement after two death options: return to the last saved point or wait for another player to revive you. It then says Novice HP is 50% and other classes have 1 HP, without separating the two routes or naming Resurrection skill levels. Treat this as ambiguous death/revival documentation, not a universal resurrection formula or natural recovery. The same page describes 1% Base/Job loss but leaves the EXP denominator and rounding unspecified; no Thai beta effective date is known.

Chapters: Thai closed beta, Thai open beta.

Thai operator interface and weight guide,undated ​

Thai operator interface and weight guide,undated — thai operator original; archived original operator guide. thai_interface_guide_2003 Archive capture: 2003-12-12. Access: text body read. The interface guide says weight over 50% stops ongoing HP/SP increase; items or skills can still restore it. Over 90% prevents attacks and skill use. This corroborates the earlier leveling guide’s weight gate, but supplies no natural amount, interval, rounding, exact equality boundary, or Thai beta effective date. The general word skill does not establish which passive recovery skills bypass the gate. Saved HTML

Scope: Original Thai operator guide captured December 12, 2003; effective build unknown.

Original URL · Archive capture

The interface guide says weight over 50% stops ongoing HP/SP increase; items or skills can still restore it. Over 90% prevents attacks and skill use. This corroborates the earlier leveling guide’s weight gate, but supplies no natural amount, interval, rounding, exact equality boundary, or Thai beta effective date. The general word skill does not establish which passive recovery skills bypass the gate.

Chapters: Thai closed beta, Thai open beta.

Thai operator Training Ground guide,undated ​

Thai operator Training Ground guide,undated — thai operator original; archived original operator guide. thai_training_guide_2003 Archive capture: 2003-12-11. Access: text body read. The Training Ground guide describes enrollment granting 50 zeny, an option to skip into a random town, and three training stages. It is an undated guide, not the missing September 18, 2002 Training Ground problem notice. It gives no natural HP/SP formula or interval. Saved HTML

Scope: Original Thai operator guide captured December 11, 2003; tutorial version unknown.

Original URL · Archive capture

The Training Ground guide describes enrollment granting 50 zeny, an option to skip into a random town, and three training stages. It is an undated guide, not the missing September 18, 2002 Training Ground problem notice. It gives no natural HP/SP formula or interval.

Chapters: Thai closed beta, Thai open beta.

Thai operator training-course guide,undated ​

Thai operator training-course guide,undated — thai operator original; archived original operator guide. thai_training_course_guide_2003 Archive capture: 2003-12-12. Access: text body read. The training-course guide says fighting Fabre in its second-stage training area raises Base progress but not Job progress. This is a tutorial-specific description, not the EXP table for ordinary field Fabre. It provides no exact EXP reward or effective Thai patch date, and no HP/SP recovery formula. Saved HTML

Scope: Original Thai operator guide captured December 12, 2003; tutorial version unknown.

Original URL · Archive capture

The training-course guide says fighting Fabre in its second-stage training area raises Base progress but not Job progress. This is a tutorial-specific description, not the EXP table for ordinary field Fabre. It provides no exact EXP reward or effective Thai patch date, and no HP/SP recovery formula.

Chapters: Thai closed beta, Thai open beta.


Read source Markdown